Sunday 1st September 2019
We moved across the canal onto the service point. Watered, did a
couple of washes while it was free, dumped rubbish and emptied the loo. We then
undertook the unorthodox manoeuvre of reversing up the lock onto the junction
above before passing through the swing bridge and back onto the Coventry Canal.
It is always a nice feeling when an unusual manoeuvre goes well, but we had many
people watching and wondering what we were up too. Nobody pointed out that we
were going the wrong way though. We moored in the first spot we saw beyond the
bridge.
After hanging out washing, we went to the Swan for our Sunday dinner
along with Dave and Eddie off nb Pianissimo DC, a couple we had met in Hopwas. We
had a fine afternoon but got back far too late to complete any of the chores we
had set ourselves.
Day Total: 1 lock; 0 miles; 0 Tunnels; 1 Swing Bridges; 0 Lift
Bridges; 0 Boat Lift; Day’s running hours 2.3
Overall Total: 724 locks; 1281 miles; 50 tunnels; 60 Swing Bridges; 11
Lift Bridges; 2 Boat Lifts; total engine running hours 801.1hrs
Comments
Post a Comment