Wednesday 5th February 2020



This morning we again moved a short distance, through Wardle Lock onto the Trent and Mersey Canal and, after watering up and doing a wash at the junction, moored, yet again, at the Middlewich Narrowboat site.

All my jobs at Tracey’s are now finished so the only thing now holding us up is an appointment for myself for an MRI scan on Saturday in Stafford.

After that we will be free to leave, probably on Monday. Roll on.



Day Total: 1 lock; 1 mile; 0 Tunnels; 0 Swing Bridges; 0 Lift Bridges; 0 Boat Lift; Day’s running hours 7.1 

                                                                                                     (including running for hot water etc)  

Overall Total: 869 locks; 1517 miles; 53 tunnels; 61 Swing Bridges; 17 Lift Bridges; 2 Boat Lifts; total engine running hours 1009.6

Comments

Popular posts from this blog