Saturday 4th
January 2020
We left for the short move through the three Middlewich Locks to once
again, moor at the Middlewich Narrowboats site.
And here we will stay for the foreseeable future with nothing much to
write about whilst here.
Weather: cold, but bright and sunny.
Day Total: 3 locks; 1 mile; 0 Tunnels; 0 Swing Bridges; 0 Lift Bridges;
0 Boat Lift; Day’s running hours 0.8
Overall Total: 861 locks; 1489 miles; 53 tunnels; 61 Swing Bridges; 17
Lift Bridges; 2 Boat Lifts; total engine running hours 971.0
Comments
Post a Comment