Saturday 4th January 2020



We left for the short move through the three Middlewich Locks to once again, moor at the Middlewich Narrowboats site.

And here we will stay for the foreseeable future with nothing much to write about whilst here.



Weather: cold, but bright and sunny.



Day Total: 3 locks; 1 mile; 0 Tunnels; 0 Swing Bridges; 0 Lift Bridges; 0 Boat Lift; Day’s running hours 0.8                         

Overall Total: 861 locks; 1489 miles; 53 tunnels; 61 Swing Bridges; 17 Lift Bridges; 2 Boat Lifts; total engine running hours 971.0

Comments

Popular posts from this blog