Friday 6th
December 2019
We left the mooring above the River Wheelock for the short run into Middlewich
where we watered up before mooring at the site of Middlewich Narrowboats again.
On the way down, we again passed our old house in St. Annes Road. A strange
feeling.
Weather: wet and generally miserable.
Day Total: 1 lock; 1 mile; 0 Tunnels; 0 Swing Bridges; 0 Lift Bridges;
0 Boat Lift; Day’s running hours 3.1 (including running for hot water etc)
Overall Total: 854 locks; 1469 miles; 53 tunnels; 61 Swing Bridges; 17
Lift Bridges; 2 Boat Lifts; total engine running hours 932.1
Comments
Post a Comment