Wednesday 13th November 2019



We had really enjoyed being moored so close to the grandkids and were grateful to Tracey for the use of the washing machine and shower. However, the towpath was very soft and the mooring stakes had to be continually repositioned, the towpath itself, while not particularly muddy, was very soft underfoot, the road was very busy, day and night and, despite reassurances before the waste recycling plant was opened, that there would be no smells, occasionally there were, and it was bad.

Today, we decided to move and have moored with Kenny and Sue at the former Middlewich Narrowboats site. Just a mile and the one lock, watering up on the way down. We had always planned and looked forward to mooring with them and possibly doing a short cruise.

Brenda went shopping with Sue while Kenny and myself chatted the afternoon away.



Day Total: 1 lock; 1 mile; 0 Tunnels; 0 Swing Bridges; 0 Lift Bridges; 0 Boat Lift; Day’s running hours 11.2      (includes 10 hours running engine for charging with battery charging troubles)

Overall Total: 811 locks; 1375 miles; 53 tunnels; 61 Swing Bridges; 17 Lift Bridges; 2 Boat Lifts; total engine running hours 885.7

Comments

Popular posts from this blog