Wednesday 13th
November 2019
We had really enjoyed being moored so close to the grandkids and were
grateful to Tracey for the use of the washing machine and shower. However, the
towpath was very soft and the mooring stakes had to be continually
repositioned, the towpath itself, while not particularly muddy, was very soft
underfoot, the road was very busy, day and night and, despite reassurances
before the waste recycling plant was opened, that there would be no smells, occasionally
there were, and it was bad.
Today, we decided to move and have moored with Kenny and Sue at the
former Middlewich Narrowboats site. Just a mile and the one lock, watering up on
the way down. We had always planned and looked forward to mooring with them and
possibly doing a short cruise.
Brenda went shopping with Sue while Kenny and myself chatted the
afternoon away.
Day Total: 1 lock; 1 mile; 0 Tunnels; 0 Swing Bridges; 0 Lift Bridges;
0 Boat Lift; Day’s running hours 11.2
(includes 10 hours running engine for charging with battery charging
troubles)
Overall Total: 811 locks; 1375 miles; 53 tunnels; 61 Swing Bridges; 17
Lift Bridges; 2 Boat Lifts; total engine running hours 885.7
Comments
Post a Comment