Sunday 23rd July
2018
Sandra altered the 240V system, replaced the consumer unit and
associated breakers, renewed the cabling on the immersion heater for heat
resistant cable and fitted the proper connectors to one of the solar panels.
So that is Sandra finished on the electrics. The whole set up now
looks so much more professional, so much neater, everything is properly
labelled, but more than that, we feel safer.
The whole job cost just short of £1000 but it is worth every penny to
us.
We met with
Chris and Donna for Sunday lunch at the Broken Cross and after they left a boat
from Orchard arrived. A couple, Mike and Judith who we had met briefly who
had just bought their boat, Swallow. We hitched a ride back with them.
Comments
Post a Comment