Sunday 23rd July 2018



Sandra altered the 240V system, replaced the consumer unit and associated breakers, renewed the cabling on the immersion heater for heat resistant cable and fitted the proper connectors to one of the solar panels.

So that is Sandra finished on the electrics. The whole set up now looks so much more professional, so much neater, everything is properly labelled, but more than that, we feel safer.

The whole job cost just short of £1000 but it is worth every penny to us.

                                                         

Before                                                       
                                                                                      After

                      

                          
                                                                                       Before



                                                             After                                                     

        

 

We met with Chris and Donna for Sunday lunch at the Broken Cross and after they left a boat from Orchard arrived. A couple, Mike and Judith who we had met briefly who had just bought their boat, Swallow. We hitched a ride back with them.






Comments

Popular posts from this blog