Friday 20th July
2018
Sandra got stuck on the job she was out to and so didn’t turn up until
4pm.
Brenda started to crotchet a circle for the galley porthole and I
pottered about and bailed out the engine bay which had water in it again after
the rain the other day. I have to find how it’s getting in.
Sandra worked until after 8pm and has ripped out all the 12V system in
the electrical locker and replaced it with an improved system. All the relays
and blade fuses have now been incorporated into a new control panel. All panels
and gauges are also mounted on a separate board within the locker.
We walked to the Broken Cross again for our dinner.
Comments
Post a Comment