Friday 20th July 2018



Sandra got stuck on the job she was out to and so didn’t turn up until 4pm.

Brenda started to crotchet a circle for the galley porthole and I pottered about and bailed out the engine bay which had water in it again after the rain the other day. I have to find how it’s getting in.

Sandra worked until after 8pm and has ripped out all the 12V system in the electrical locker and replaced it with an improved system. All the relays and blade fuses have now been incorporated into a new control panel. All panels and gauges are also mounted on a separate board within the locker.

We walked to the Broken Cross again for our dinner.

Comments

Popular posts from this blog